Gargoyles
I saw these two cars outside of my work about a week ago. The guy built the one pictured below on a VW frame. It took him about 18 months.
Here is a close up of one of the side lights:
« September 2006 | Main | March 2009 »
I saw these two cars outside of my work about a week ago. The guy built the one pictured below on a VW frame. It took him about 18 months.
Here is a close up of one of the side lights:
Posted by DK at 10:02 PM | Permalink | Comments (1)